Construction of a High-Bay Warehouse with Final Assembly Building; Construction of Conference and Display Space

1st Prize: Architectural Selection Competition

With the construction of a high-bay warehouse for the Riffelmacher & Weinberger company, the existing corporate buildings will not only receive much-needed storage space for production goods, but at the same time restructure and optimize the flow of materials within the entire complex.
The building project includes both a high-bay warehouse and a new three-story final assembly building with conference rooms and display space in the upper stories. Through sensitive and thoughtful changes in the existing structures, the entire industrial complex will be modernized, simplifying work processes. The changes will be implemented in two construction phases.
The support structure of the building consists of pre-cast reinforced concrete elements. The façade is made up of horizontal silver-colored sandwich panels and modular dark plain sheetmetal panels, highlighting the central access core.

start of planning – 2017
start of building – 2018
completion – 2019