Production Hall, Wind Power Stations, Rexroth Bosch Group

New Construction

As part of a world-wide network, a new facility for the production of components for wind power stations will be built in Nuremberg. The production encompasses the mechanical fabrication of drive components, their assembly and subsequent testing of the drive mechanism. The drives to be produced weigh 20 to 50 tons. The new production hall will feature a column grid of 12.00m x 27.00m bays. Cranes can therefore drive into position anywhere within the hall. Other areas include a heat-treatment shop, delivery and shipment areas and administrative offices. For the new construction, 50% of the old production building will be torn down and the technical infrastructure will be completely rebuilt.

Planning Start – September 2007
Construction Start – February 2008
Completion – November 2008