Mögeldorf Medical Centre
Nuremberg · 2006–2008
A new four-storey building in the Ostendstraße closed a gap in the tight urban ensemble at the centre of Mögeldorf (Am Mogeldorfer Plärrer). The new construction picks up both the height and the roof line of neighbouring buildings and thereby completes the urban landscape of the Mögeldorfer Plärrer. Together with a neighbouring building, the new construction defines a structural edge along the Ostendstraße. The construction, along with buildings on the main street in Mögeldorf, closes a gap in an existing block, significantly improving space in the interior of the block.
- Client
- MÄZ
- Location
- Nuremberg – Mögeldorf
- Type of works
- New build
- Work stages (HOAI)
- 1-8
- Status
- Completed
- Typology
- Industry & Commerce, Office & Administration
- Year
The tree located in the middle of the façade is a distinctive symbol. Not only does it mark the urban “gate” leading to the town, but as a “tree of life” it also serves to identify the building’s use as a health centre.
Questions about services, studio or projects? Contact





